Progress
timeline of main milestones
description of the milestones
2024
M2.1 Requirements of the Open Digital Platform for HER Aircraft Development
Requirements model shared and agreed within the entire consortium.
M2.2 ODE4HERA Benchmark Case
Definition of a benchmark case representative of the performance of the legacy industry process for the development of conventional regional configuration. Benchmark case model.
M3.1 Intermediate version of Technologies Connecting Simulation and Product Life Cycle Data
Intermediate version of methods and tool developed to ensure consistency and traceability among SDM and PLM. PoC implemented.
M4.1 AC1 Requirements
Requirements model shared and agreed with WP4.
M5.1 AC2 Requirements
Requirements model shared and agreed with WP5.
2025
M4.2 Intermediate Version of AC1 Repository of HER Block Models
Preliminary set of block models accessible via the ODP.
M5.3 Intermediate Version of AC2 Repository of HER Block Models
Preliminary set of block models accessible via the ODP.
M2.3 Intermediate Version of ODP Solution-Neutral Architecture
A first version of the ODP Solution-Neutral Architecture (SNA) and the MBSE Architectural Framework for HERA (AF4HERA) is released, containing all the main elements and draft version of the connections among the different phases of the development process. Intermediate version of SNA model available for entire consortium.
M6.2 First Technological / Thematic Workshop held
Official record of the discussions, decisions and action items agreed upon during the workshop.
2026
M3.2 Final Release of the Open Digital Platform
All the interfaces developed in D3.7 and D3.8 are connected here with a centralized database acting as the single source of truth to enable consistency and tracebility through the entire development process. Complete data compatibility, consistency and traceability is enabled through the entire development process for HER configurations. Automatic data transfer from one application to another is also implemented and the user interface is completed.
M4.3 AC1 Final Assessment
Formulation and Execution of the MDO workflow for the AC1 by means of the dedicated module in the ODP.
M5.4 AC2 Final Assessment
The performance of the entire IV&V workflow is assessed against the benchmark case.